Core Design Scheme for Air Traffic Control Tower
Консоли командного центра

Общие положения по проектированию

The product adapts to full operational scenarios including routine tower control at trunk and regional airports, high-volume flight scheduling, and emergency response under extreme weather conditions. It balances long-shift comfort for air traffic controllers and long-term operational stability of equipment. This air traffic control (ATC) tower console is designed in strict compliance with civil aviation industry standards, tailored to the exclusive operation scenarios of tower control integrating overhead visual monitoring and multi-screen data collaboration. It features 24/7 uninterrupted stable operation, zero-tolerance safety control, unobstructed panoramic vision, and modular integrated design.
Основные принципы проектирования
1. Prioritize unobstructed exterior viewing vision
2. Ergonomic human-machine adaptation
3. Full-link safety redundancy
4. Integrated and compact wiring layout
5. Low-noise stable operation & maintenance

Общая планировка и проектирование конструкций

Overall Layout Configuration

Adopting the industry-standard integrated curved layout, the console fits the circular viewing space of ATC towers perfectly. Multiple workstations are integrated side-by-side in one-piece molding with streamlined, neat, symmetrical and balanced overall lines.
It strictly follows the tower-specific structural logic: unobstructed front viewing area, central operation equipment zone, concealed rear wiring compartment. No supporting columns or protruding equipment blocks the line of sight, fully satisfying the 360° visual observation requirements of runways, taxiways and aircraft stands in the tower. The physical layout delivers a tidy, professional and stable working environment for air traffic control operations.

Эргономический стандарт
Размеры

Designed with standardized ATC ergonomic dimensions and aviation-grade compliant materials, the console perfectly adapts to controllers’ horizontal visual observation and upward operating postures. It supports 24/7 non-stop tower on-duty operations, delivering optimal balance of operational comfort, unobstructed panoramic vision, stable system performance and long-lasting structural durability.

Ergonomic Design: Adopting an integrated one-piece curved structure, the console ensures consistent visual distance and smooth operating paths for all workstations. It features a standard desktop height of 750mm, individual workstation size of 1200mm × 600mm, and equipment compartment dimension of 450mm × 550mm. The recessed embedded screen structure creates zero obstruction to external tower vision.

Core Zoned Product Functions

Leveraging the integrated curved structure, the console is divided into four dedicated and interlinked functional zones. Each zone performs its exclusive functions and supports collaborative operation to meet the full-spectrum command and control requirements of tower operations.
Primary Control Operation Zone (Core Zone)

Primary Control Operation Zone (Core Zone): Integrated with physical operation buttons and layered display terminals, this zone realizes organic linkage between outdoor visual observation and digital screen data. It supports core command and scheduling operations, including aircraft takeoff and landing, taxiing, and traffic avoidance management.

Auxiliary Collaboration Zone

Primary Control Operation Zone (Core Zone): Integrated with physical operation buttons and layered display terminals, this zone realizes organic linkage between outdoor visual observation and digital screen data. It supports core command and scheduling operations, including aircraft takeoff and landing, taxiing, and traffic avoidance management.

Hidden Equipment & Wiring Zone

Primary Control Operation Zone (Core Zone): Integrated with physical operation buttons and layered display terminals, this zone realizes organic linkage between outdoor visual observation and digital screen data. It supports core command and scheduling operations, including aircraft takeoff and landing, taxiing, and traffic avoidance management.

Зона управления аварийным резервированием

Primary Control Operation Zone (Core Zone): Integrated with physical operation buttons and layered display terminals, this zone realizes organic linkage between outdoor visual observation and digital screen data. It supports core command and scheduling operations, including aircraft takeoff and landing, taxiing, and traffic avoidance management.

Другие отраслевые решения · Yundian Ruikong

Управление общественной безопасностью

Отраслевые решения

В основном он используется в центрах управления службами общественной безопасности, центрах мониторинга и
другие аналогичные объекты. Консоль управления командного центра объединяет
системы связи, системы видеонаблюдения, системы анализа разведывательной информации и многое другое.
Управление воздушным движением
(ATC)

01

Комплексное управление «умным городом»

02

Спасательные операции
Диспетчеризация

03

Электроэнергия
/Энергетика

04

Общественная безопасность
Руководство

05

Избранные международные партнеры · Yundian Ruikong

Свяжитесь с нами

Контактная форма